Harris & Bruno International (Sub-Bids to Ginno Construction)

Phase 1 & Phase 2: All civil including storm drains, water, sewer, roof drains, rough grading (includes phases 1-3), and swales. Also includes site electrical as required to complete phase 1. Includes landscaping at swales.

Status

Accepting Bids

Bid Date10/28/21 2:00pm

Company & Contacts

Ginno Construction Company

Justin Cooper justin@ginnoconstruction.com   208-667-5560

Location

Post Falls, ID

Bidders may download electronic files at no cost. Printed documents are available, at Bidder’s expense, by choosing the “Order” option.

Base Bid:

Phase 1 & Phase 2: All civil including storm drains, water, sewer, roof drains, rough grading (includes phases 1-3), and swales. Also includes site electrical as required to complete phase 1. Includes landscaping at swales.

Phase 1 Only: Phase 1 building and site complete.

Alternate 1: Phase 2 building and site complete, except for the work already performed under the base bid. See attached “Site Concrete and Asphalt Phasing Clarification” plan showing extent of site concrete and asphalt in phase 1 vs phase 2.

Additional Clarifications:

1. Mechanical, electrical, and plumbing is design build and those subcontractors have already been pre-selected.