St. Joseph's Catholic Church Parish Hall (SUB-BIDS) - Spirit Lake

Community Hall, main level of 2548 sq. ft. with unfinished daylight basement of 2368 sq ft. The main level: Hall, Kitchen, 2 bathrooms & small storage area. The unfinished basement : finished slab floor with rough in electrical for lighting and outlets. Mechanical room with gas furnace /electrical for heat pump + main electrical panel. Rough in plumbing for both future bathrooms. The down stairs shall be fully insulated. See plans for details.
  Additional Information (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
church calcs (1) 3.3 MB
Contractorquestions.docx 15.7 KB
PDF0697-01 218.5 KB
PDF0698-01 282.6 KB
st joseph 878.4 KB
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Invitation to Bid 53.3 KB
02 - List of Corrections and Clarifications 76.2 KB
03 - Hall Electrical Requirements 68.8 KB
05 - Doors Windows 78.7 KB
06 - Approved Engineers Calcs 387.6 KB
07 - Approved HVAC 1 Security Locked 5.8 MB
08 - Approved Trusses Security Locked 7.3 MB
09 - Structural Calculations - Also posted as Memo 02 3.3 MB
10 - M01 4 - Notice 34.7 KB
11 - Structural Calcs - St. Josephs Church 340.7 KB