New Coeur d’Alene Elementary School (Sub-Bids - Ginno Construction)

The work includes new building construction. The work listed below is not intended to cover every work item required by the contract documents; the General Contractor is responsible for all work indicated in those documents, whether listed here or not. a. The building construction includes, cast-in-place concrete, unit masonry, structural steel, steel stud framing systems, exterior and interior finish carpentry, foundation waterproofing, building insulation, sheet metal flashing and trim, new roofing systems, roof accessories, fire stopping systems, joint sealants, steel doors and frames, interior wood doors, sectional overhead doors, door hardware, glass, gypsum board, tiling, suspended ceiling systems, painting, building specialties, windows with integral blinds, manufactured casework, telescoping stands, fire sprinkler systems, HVAC and plumbing systems, electrical power, lighting and communication systems, as indicated on the Drawings and specified herein. b. The site construction includes site clearing, water, gas, electric and fire water services, grading, drainage control, site and building excavation and backfilling, concrete paving, asphalt paving, landscaping, irrigation, and other site improvements as indicated on the Drawings and specified herein.

Status

Bidding Closed

Bid Date7/2/19 5:00 pm

Company & Contacts

Ginno Construction Company

Dave Renaldo, dave@ginnoconstruction.com   (208) 667-5560

Location

Coeur d'Alene, ID

Project Estimate: $10,800,000

Bidders may download electronic files at no cost. Bidders may obtain printed documents by choosing the “Order” option. Refundable documents are available for qualified Bidders.