Spokane Conservation District Phase 1 Office (Sub-Bids to Ginno Construction)

The project is a 12,436 square foot single story office building. Primarily wood framed with structural steel components. Siding materials are a mix of cor-ten and barnwood siding. Roofing is TPO. Interiors include finished office space and open to structure public spaces. Site work includes parking. landscaping and driveway paving.
  Volume 1 (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover and Table of Contents 45.0 KB
02 - Division 00 - Procurement and Contracting Requirements 3.4 MB
03 - Division 01 - General Requirements 900.9 KB
  Volume 2 (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover 44.4 KB
02 - Table of Contents 65.6 KB
03 - Division 02 - Existing Conditions 82.6 KB
04 - Division 03 - Concrete 445.1 KB
05 - Division 05 - Metals 165.9 KB
06 - Division 06 - Wood, Plastics, and Composites 371.4 KB
07 - Division 07 - Thermal and Moisture Protection 1.1 MB
08 - Division 08 - Openings 398.3 KB
09 - Division 09 - Finishes 315.9 KB
10 - Division 10 - Specialties 178.8 KB
11 - Division 11 - Equipment 62.8 KB
12 - Division 12 - Furnishings 93.3 KB
  Volume 3 (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover 44.2 KB
02 - Table of Contents 65.7 KB
03 - Division 21 - Fire Suppression 255.5 KB
04 - Division 22 - Plumbing 1.4 MB
05 - Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) 2.2 MB
06 - Division 26 - Electrical 2.5 MB
07 - Division 27 - Communications 689.5 KB
08 - Division 28 - Electronic Safety and Security 631.2 KB
09 - Division 31 - Earthwork 337.6 KB
10 - Division 32 - Exterior Improvements 594.0 KB
11 - Division 33 - Utilities 278.1 KB