Public Jobs

Bids due in 8 days
5/2/19 2:00 pm
Athol Convenience Store (Sub-Bids - Ginno Construction) - Athol
Ginno Construction Company
Athol, ID
The Athol Convenience Store is a new construction detached wood framed building that will be used as a convenience store and a small restaurant. The scope of work will include all site development, but will not include the pump island area.
Bids due in 7 days
5/1/19 2:30 pm
Office Renovation Yadon Construction Specialties (Sub-Bids - Ginno Construction)
Ginno Construction Company
Spokane, WA
TENANT IMPROVEMENT INCLUDING NEW MECHANICAL AND ELECTRICAL SYSTEMS, SITE MAINTENANCE, AND DESIGN OF NEW OFFICE SPACE THAT WILL BE MODERN, FUNCTIONAL AND ADA COMPLIANT. WORK INCLUDES ALL SITEWORK, MECHANICAL, ELECTRICAL AND PLUMBING COMPONENTS.
Bids due in 8 days
5/2/19 2:00 pm
Kootenai County Sheriff's Office Vehicle Storage (Sub-Bids - Ginno Construction)
Ginno Construction Company
Coeur d'Alene, ID
The scope of this project is to construct a new wood framed 3749 sq. ft. vehicle storage building. The project scope includes, site development, building erection, and finishes.
Bidding Closed
4/16/19 3:00 pm
Craig Guest House (Sub-Bids - Ginno Construction)
Ginno Construction Company
Post Falls, ID
Bids due in 6 days
4/30/19 5:00 pm
New Post Falls Elementary School at Foxtail (Sub-Bids - Ginno Construction)
Ginno Construction Company
Post Falls, ID
The Work consists of the following: 1. The Work includes building demolition, selective demolition, and new building construction, the work listed below is not intended to cover every work item required by the contract documents; the General Contractor is responsible for all work indicated in those documents, whether listed here or not. a. The building construction includes, cast-in-place concrete, unit masonry, structural steel, steel stud framing systems, wood trusses, exterior and interior finish carpentry, foundation waterproofing, building insulation, sheet metal flashing and trim, new roofing systems, roof accessories, fire stopping systems, joint sealants, steel doors and frames, interior wood doors, sectional overhead doors, door hardware, glass, gypsum board, tiling, suspended ceiling systems, painting, building specialties, windows with integral blinds, manufactured casework, telescoping stands, fire sprinkler systems, HVAC and plumbing systems, electrical power, lighting and communication systems, as indicated on the Drawings and specified herein. b. The site construction includes site clearing, water, gas, electric and fire water services, grading, drainage control, site and building excavation and backfilling, concrete paving, asphalt paving, landscaping, irrigation, and other site improvements as indicated on the Drawings and specified herein.
Pereira Residence
Ginno Construction Company
Hayden Lake, ID
New Construction - Pereira Residence Hayden Lake, ID.
Bidding Closed
4/12/19 3:00 pm
Water Department Administration and Maintenance Facility (Sub-Bids - Ginno Construction)
Ginno Construction Company
Coeur d'Alene, ID
New approximately 20,000 SF single story pre-engineered metal building containing office, shops, and maintenance facilities. Work includes related sitework, mechanical, electrical, plumbing, landscaping and other Work indicated in the Contract Documents.
Bidding Closed
4/4/19 1:00 pm
North Idaho College Boswell Hall Mechanical Upgrade (Sub-Bids - Ginno Construction)
Ginno Construction Company
Coeur d'Alene, Northern ID
The general scope of work is to replace all the existing mechanical equipment as noted on the plans and specifications. The intent of this work shall replace: 1.1. Ceiling, inline and rooftop exhaust fans, 1.2Air handlers including ah1, ah2, and ah3 with their respective return fans rf 1 and rf2. 1.3. Baseboard heaters and convectors on the walls, 1.4. Fan coils in or above the ceiling, 1.5. Classroom unit ventilators, 1.6. Roof cowls (as noted on the original plans), roof caps, and outside air intakes, 1.7. Air conditioning unit identified as ac1 on the roof, 1.8. Rooftop air conditioning direct expansion condenser identified as cu1 on the roof, 1.9. Unit heaters as noted on the plans. (one existing unit heater has been removed and will not be replaced and the second unit heater in the same room shall be removed and not replaced), 1.10. The existing taco heating water pumps will not be replaced, but the triple duty valve will be removed and not replaced. 1.10.1. The triple duty valves shall be replaced with a wafer check valve. 1.10.2. Bell and gosset heating water booster pump shall be replaced. 1.11. Minor electrical work is required and shall include: 1.11.1. Disconnecting power from equipment noted above and as noted on the plans, 1.11.2. Installing new electrical service to 14 inline fans above the ceiling in the classrooms indicated on the plans, 1.11.3. Installing variable frequency drives (VFDS) at the chilled water pump and the heating water pumps in the machine room.
Bidding Closed
4/4/19 2:00 pm
North Idaho College Schuler Performing Arts Refresh (Sub-Bids - Ginno Construction)
Ginno Construction Company
Coeur d'Alene, ID
A description of the work of this project can be summarized to include demolition of a portion of the existing auditorium seating and attachments, installation of new auditorium seating and installation of new railings.
Bidding Closed
3/22/19 1:00 pm
Maverik, Inc. Store (Sub-Bids Ginno Construction) - Coeur d'Alene
Ginno Construction Company
Coeur d'Alene, ID
The Work consists of construction of the building and surrounding site work: The Work includes excavation, site demolition (see plans), site work, asphalt, concrete, steel framing, structural steel, gypsum drywall, insulation, single ply roofing, roofing specialties, metal roofing, storefront glazing systems, electrical, HVAC, plumbing, acoustical ceiling, doors and frames, hardware, flooring, floor coatings, ceramic tile, paint, millwork, vendor equipment, fuel piping and equipment, etc.